Warrick County School

Warrick County School Corporation

Project Specifics

Services Provided

Roof Assessment
Roof Replacement Design
Bidding Services
Construction Administration
Quality Observation
Performance Testing
Project Closeout

Project Focus

Replace Aging Roof Systems
Improve Long-Term Roof Performance
Support Code-Compliant Design
Verify Installation Quality
Coordinate Project Delivery Through Closeout

Roof Replacement Design and Construction Services

From Assessment Through Project Closeout

Technical Assurance provided full professional services for the approximately 120,000-square-foot roof replacement at Castle North Middle School in Newburgh, Indiana. The project included assessment, design, bidding, construction administration, quality observation, performance testing, and project closeout.

The project began with a comprehensive building enclosure evaluation to document existing roof conditions and identify system performance issues. Roof core cuts, condition assessments, testing, and photographic documentation informed recommendations aligned with Warrick County School Corporation’s budgetary and operational goals.

Performance-Based Roof Replacement Design

Technical Assurance developed technical specifications, construction documents, and roof replacement details addressing the aging low-slope modified bitumen roof system. Design considerations included flashing, insulation, drainage, current code requirements, and long-term system performance.

During the bid phase, Technical Assurance coordinated the bidding process with the district, including pre-bid meetings, contractor interviews, and a recommendation for award.

Construction Administration and Quality Observation

Throughout construction, Technical Assurance provided project administration, submittal reviews, site visits, and part-time quality observation to verify that installation aligned with the design intent. Field observations included material application testing and coordination of third-party testing as needed.

Technical Assurance remained involved through project closeout, completing the final punch list and compiling closeout documentation for the district. The roof replacement was completed in 2022 with a project budget of approximately $852,900.

Gallery

Other Projects

Mock up test

Confidential Semiconductor Manufacturer

Read Case Study

Manufacturing roof with water

Nestlé USA

Read Case Study

Ballasted Low-Slope Roof

Orange Water and Sewer Authority (OWASA)

Read Case Study

Have Peace of Mind with Technical Assurance

We are your expert partners in solving critical building envelope issues and extending the life of your facility’s assets. Request a consultation to get started!