Ice damming

Cleveland Army Reserve Center

Project Specifics

Services Provided

Roof Assessment
Building Enclosure Assessment
Remediation Design
Construction Documents
Quality Observation
Infrared Testing

Project Focus

Identify Sources of Ice Damming
Correct Roof Ventilation Deficiencies
Reduce Water Infiltration
Verify Remediation Performance

Roof Ice Dam Assessment and Remediation

Solving Persistent Ice Damming Through Building Enclosure Investigation

The Cleveland Army Reserve Center in Twinsburg, Ohio, had experienced severe icicle formation along roof edges and gutters during winter months since the facility’s original construction. The recurring ice damming contributed to significant interior water infiltration while creating ongoing maintenance concerns for the roof, gutters, and drainage systems.

Technical Assurance was retained to investigate the conditions contributing to the problem and evaluate how the building envelope and roof design and construction were affecting roof performance.

Tracing the Problem Beyond the Roof Surface

Technical Assurance’s investigation determined that improper roof ventilation was a primary contributor to the ice-damming conditions. The assessment also identified multiple design and installation issues affecting airflow, drainage, and overall roof performance.

Conditions included improperly sized or configured gutters and downspouts, heat-tracing cables that were not designed for a commercial building of this size and drainage demand, and an interior smoke wall that restricted airflow beneath the roof deck. Additional deficiencies included breaches and voids in the air/vapor retarder, batt insulation obstructing intake airflow, and improperly installed shingle fasteners.

From Investigation Through Remediation Verification

Following the assessment and analysis, Technical Assurance developed a remediation approach to address the conditions contributing to ice formation and water infiltration. The team then provided quality observation during remediation to verify that corrective work was completed in accordance with the construction documents.

After construction, Technical Assurance performed infrared scanning to verify that the corrected roof ventilation system was functioning as intended. This final performance check extended the assignment beyond identifying the source of the problem to confirming that the implemented solution addressed the underlying building enclosure conditions.

Gallery

Other Projects

Mock up test

Confidential Semiconductor Manufacturer

Read Case Study

Manufacturing roof with water

Nestlé USA

Read Case Study

Ballasted Low-Slope Roof

Orange Water and Sewer Authority (OWASA)

Read Case Study

Have Peace of Mind with Technical Assurance

We are your expert partners in solving critical building envelope issues and extending the life of your facility’s assets. Request a consultation to get started!