Cleveland Heights University Heights

Cleveland Heights-University Heights City School District

Project Specifics

Services Provided

Building Envelope Assessments
Window Replacement Design
Masonry Restoration Design
Construction Documents
Project Management
Quality Observation

Project Focus

Replace Aging Window Systems
Address Concealed Masonry Defects
Preserve Historic Building Character
Control Construction Costs
Minimize Change Orders

Window Replacement and Masonry Restoration

Preserving Historic Character While Improving Building Performance

Technical Assurance served as prime consultant for a major window replacement and masonry restoration program for the Cleveland Heights-University Heights City School District. The multi-phase program ultimately replaced 990 windows across four school facilities while addressing complex masonry conditions surrounding the existing window systems.

The work began with detailed inspections and condition assessments of the building façades and windows. During this process, Technical Assurance identified concealed masonry defects that needed to be addressed before window replacement could proceed, allowing those conditions to be incorporated into the restoration strategy rather than discovered later during construction.

Addressing Concealed Masonry Conditions

In addition to addressing existing conditions, the design team worked to maintain the architectural character of the school buildings. Historical photographs were reviewed to inform the development of replacement window systems that complemented the original appearance while addressing current performance needs.

Technical Assurance developed construction documents and provided project management and quality observation services throughout construction. The first phase replaced 525 windows at two school facilities along with substantial masonry repairs, followed by an additional 465 window replacements at district facilities in 2005.

Controlling Cost and Change Orders

Careful investigation and planning helped the district address concealed conditions early and control changes during construction. At completion, the overall program finished 13.5% under budget, with additional change orders totaling only 1.3% of the original contracts.

Gallery

Other Projects

Mock up test

Confidential Semiconductor Manufacturer

Read Case Study

Manufacturing roof with water

Nestlé USA

Read Case Study

Ballasted Low-Slope Roof

Orange Water and Sewer Authority (OWASA)

Read Case Study

Have Peace of Mind with Technical Assurance

We are your expert partners in solving critical building envelope issues and extending the life of your facility’s assets. Request a consultation to get started!