Technical Assurance was engaged by Heapy Engineering to provide BECx services for the UH Avon Medical Building. The project consisted of new construction of a 37,000 SF Medical Center performing infusion treatment.
Technical Assurance provided periodic technical quality observation site visits to observe typical construction installations pertaining to the building enclosure. Site visits were focused on air/vapor barrier installations, curtain wall installations, window installations, roof system installations, and any other project specific systems pertaining to the building enclosure and related performance.