Cleveland Museum Natural History

Cleveland Museum of Natural History

Project Specifics

Services Provided

Building Enclosure Commissioning
Pre-Design and Design Review
Submittal Review
Quality Observation
Performance Testing
Infrared Thermography

Project Focus

Establish and Improve Facility Conditions
Extend Useful Service Life
Improve Safety and Quality Conditions
Improve Portfolio Value

Building Enclosure Commissioning for Museum Expansion and Renovation

Supporting Enclosure Performance Through a $150 Million Museum Transformation

Technical Assurance was engaged by Karpinski Engineering to provide building enclosure commissioning services for the Cleveland Museum of Natural History’s multi-phase expansion and renovation in Cleveland, Ohio. The $150 million program included a new 50,000-square-foot addition constructed on an existing parking lot, along with significant renovations to existing facilities that transformed the museum’s public spaces and visitor experience.

Technical Assurance provided independent, third-party BECx services throughout the project, supporting verification of enclosure performance objectives as the new construction was integrated with the museum’s existing facilities.

Integrating Enclosure Performance from Design Through Construction

Technical Assurance’s involvement began with pre-design and design-phase reviews of enclosure-related drawings and specifications. As the project progressed into construction, the team reviewed technical submittals and performed periodic on-site quality observation focused on critical enclosure systems.

Field observations included air and vapor barrier installations, curtain wall and window systems, roof assemblies, and other enclosure components affecting long-term building performance.

Using Infrared Evaluation to Verify Enclosure Performance

As part of construction-phase verification, Technical Assurance performed infrared thermographic evaluation of the building enclosure in accordance with ASTM C1060. Testing was used to assess insulation continuity and identify potential pathways for air exfiltration.

The infrared evaluation did not identify conditions indicative of air leakage, and no issues of concern were observed during the enclosure review. These results provided additional verification of appropriate installation and enclosure performance at the time of observation.

Carrying BECx Through Phased Project Completion

The museum’s expansion and renovation progressed through phased completion, with Technical Assurance’s BECx services concluding in late 2024 following construction-phase verification and performance testing. The commissioning process supported confirmation of enclosure performance objectives while contributing to the project’s long-term durability and operational goals.

Gallery

Other Projects

Mock up test

Confidential Semiconductor Manufacturer

Read Case Study

Manufacturing roof with water

Nestlé USA

Read Case Study

Ballasted Low-Slope Roof

Orange Water and Sewer Authority (OWASA)

Read Case Study

Have Peace of Mind with Technical Assurance

We are your expert partners in solving critical building envelope issues and extending the life of your facility’s assets. Request a consultation to get started!