Greenon Local School District

BECx Services

In 2017 Technical Assurance was engaged by Heapy Engineering to provide BECx services for the Greenon Local Schools new construction project. The project included a new 188,405 SF elementary, middle and high school to house over 1,500 students in grades PK-12. The scope of work also included the abatement and demolishment of Indian Valley Middle School, Greenon Jr./Sr. High School and the abatement of Enon Elementary.

Technical Assurance provided adhesion testing during the installation of spray foam systems, confirming good adhesion of the weather barrier. Additionally, we provided quality observation during the roof install, identifying installation issues that need to be addressed. Our primary focus during QO visits was to ensure that the building envelope provides a continuous weather and thermal barrier and that it is installed in compliance with the design intent.

Project Details

Project Specifics: 

  • 188,405 Square Feet
  • PK-12
  • Academic Campus
  • LEED Silver

Services Provided:  

  • Design Review
  • Quality Observation
  • Functional Testing
  • Field Testing
  • Performance Testing

Project Focus: 

  • BECx Services

Request a Consultation

Interested in gaining better control of your building envelope assets like we’ve done for our clients? Let’s set up a consultation so we can get to know you and your facilities.

  • This field is for validation purposes and should be left unchanged.